Screening Analysis Stabilitas Lereng Bendungan Urugan Akibat Gempa Di Indonesia
DOI:
https://doi.org/10.32679/jth.v8i1.215Keywords:
Embankment dam, Screening Analysis, Slope stability, earthquake, MDEAbstract
The 2010 seismic hazard map shows the acceleration of the maximum design earthquake (MDE) scenario has increased approximately 2 fold, this case raises the question of how the dam designed by the pervious seismic load. Today Indonesia has more than 210 large dams. Therefore it is necessary to do screening analysis to find out which dam needs to be more detailed analysis and which are not. Screening analysis is done for embankment dam with fondation not on soft soil, or on the body or foundation of the dam there is a material that can lose shear strentgh due to dynamic load. Screening analysis begins with determining a typical dam for use in parametric studies of embankment parameters, variation of slope, and seismic loads on the safety of slope stability due to earthquake. The parametric study were then used as a basis for screening of embankment dam seismic slope stability. From 38 rockfill dam analyzed, all of them passed the screening under MDE scenario, and from 55 earthfill dam 40% of them not pass the screening on the 50% remaining free board requirement due to MDE scenario so that further analysis was needed. Previously to know the seismic slope stabilit of embankment dam doe to seismic hazard map revision, usually done one by one analysis with pseudostatic method, in this paperfor the first time in Indonesia applied screening analysis for slope stability analysis of dam due to earthquake.References
Daniel Pradel, F., Joseph Wartman, M., and Binod Tiwari, M., 2013, Failure of the Fujinuma Dams during the 2011 Tohoku Earthquake, Geo-Congress 2013: 1566-1580.
Dirjen SDA, 2008, Analisis Dinamik Bendungan Urugan, Departemen Pekerjaan Umum.
Dirjen SDA, 2014, Dams of Indonesia, Kementerian Pekerjaan Umum.
Irsyam, M., 2010, Peta Bahaya Gempa Bumi Indonesia, Kemen. PU.
ICOLD, 2010, Selecting seismic parameters for large dams. Guidelines, Revision of Bulletin 72, Committee on Seismic Aspects of Dam Design, International Commission on Large Dams, Paris.
Kasiro, I., 1995, Bendungan Besar Indonesia, Departemen Pekerjaan Umum.
Matsumoto, N., Sasaki, T. and Ohmachi, T. (2011). The 2011 Tohoku earthquake and dams, Proc. Int. Symp. On Dams and Reservoirs under Changing Challenges, Schleiss & Boes (Eds). 79th Annual Meeting of ICOLD, Swiss Committee on Dams, Lucerne, Switzerland, June 1.
Najoan, T., F., 2004, Analisis Stabilitas Bendungan Akibat Gempa, Kemen. Pemukiman dan Prasarana Wilayah.
Wieland M., 2006, Earthquake safety of existing dams, keynote lecture, Proc. First European Conference on Earthquake Engineering and Seismology, 1ECEES, (a joint event of the 13th European Conference on Earthquake Engineering & 30th General Assembly of the European Seismological Commission), Geneva, Switzerland, 3-8 September.
Wieland M., 2012, Seismic Design and Performance Criteria for Large Storage Dams, World Conference Earthquake Engineering 15th, Lisboa 2012.
Y. Yamaguchi et al., 2012, Safety inspections and seismic behavior of embankment dams during the 2011 off the Pacific Coast of Tohoku earthquake. Soils and Foundations 52: 945–955.
Downloads
Published
How to Cite
Issue
Section
License
The Authors submitting a manuscript do so on the understanding that if accepted for publication, copyright of the article shall be assigned to Jurnal Teknik Hidraulik and Direktorat Bina Teknik Sumber Daya Air, Direktorat Jenderal Sumber Daya Air, Kementerian Pekerjaan Umum dan Perumahan Rakyat as publisher of the journal. This journal is license under CC-BY-SA or the creative comments attribution-ShareAlike license.
Copyright encompasses exclusive rights to reproduce and deliver the article in all form and media, including reprints, photographs, microfilms and any other similar reproductions, as well as translations. The reproduction of any part of this journal, its storage in databases and its transmission by any form or media, such as electronic, electrostatic and mechanical copies, photocopies, recordings, magnetic media, etc. , will be allowed only with a written permission from Jurnal teknik Hidraulik and Direktorat Bina Teknik Sumber Daya Air, Direktorat Jenderal Sumber Daya Air, Kementerian Pekerjaan Umum dan Perumahan Rakyat.
Jurnal teknik Hidraulik and Direktorat Bina Teknik Sumber Daya Air, Direktorat Jenderal Sumber Daya Air, Kementerian Pekerjaan Umum dan Perumahan Rakyat, the Editors and the Advisory International Editorial Board make every effort to ensure that no wrong or misleading data, opinions or statements be published in the journal.